داده های ثبت شده در پورتال
1
Hooman Rouhani, Ebrahim Farrokh,
"Failure analysis of Nehbandan granite under various stress states and strain rates using a calibrated Riedel–Hiermaier–Thoma constitutive model", Geomechanics and Geophysics for Geo-Energy and Geo-Resources,
Vol. 10,
Num. 157,
Page 1-23,
September 2024,
2
Ebrahim Farrokh, Hamid Rokhy, Davood Lotfi,
"On the application of RHT model and SPG algorithm for the analysis of rock cutting process", SIMULATION MODELLING PRACTICE AND THEORY,
Vol. 136,
Num. 103012,
Page 1-15,
August 2024,
3
Dariush Mohammadi, Kourosh Shahriar, Parviz Maarefvand, Ebrahim Farrokh,
"Cutting wheel opening configuration in soft ground shield tunneling by considering field and numerical studies", Journal of Mining and Environment,
Vol. 0,
Num. 0,
Page 0-0,
August 2024,
4
Ebrahim Farrokh,
"Design and optimization of layout patterns for rock TBM cutterheads", Geomechanics and Engineering,
Vol. 38,
Num. 2,
Page 179-189,
July 2024,
5
Mehdi Heydari, Ebrahim Farrokh, S.Hasan Khoshrou,
"Parameter determination of Johnson–Holmquist–Cook constitutive model and calibration for Indiana Limestone", Geomechanics and Geophysics for Geo-Energy and Geo-Resources,
Vol. 10,
Num. 122,
Page 1-26,
July 2024,
6
Ebrahim Farrokh, Hamid Rokhy, Davood Lotfi,
"Evaluation of side forces for gauge cutters through LS-DYNA 3D numerical simulations", Arabian Journal of Geosciences,
Vol. 17,
Num. 211,
Page 1-8,
June 2024,
7
Rouhani Mohammad Matin, Ebrahim Farrokh,
"Chisel bits cutting force estimation using XGBoost and different optimization algorithms", COMPUTERS AND GEOTECHNICS,
Vol. 172,
Num. 10646,
Page 1-13,
May 2024,
8
Shahin Fattahi Dehkaboodi, Ebrahim Farrokh, Davood Lotfi,
"Study of the effect of penetration depth and disc speed on cutting forces using LS-DYNA simulations", Amirkabir Journal of Civil Engineering,
Vol. 0,
Num. 0,
Page 1-18,
December 2023,
9
Young Jin Shin, Ebrahim Farrokh, Jaehoon Jung, Jaewon Lee, Hanbyul Kang,
"A study of rotary cutting machine (RCM) performance on Korean Granite", ENGINEERING COMPUTATIONS,
Vol. 0,
Num. 0,
Page 1-35,
December 2023,
10
Dariush Mohammadi, Kourosh Shahriar, Parviz Maarefvand, Ebrahim Farrokh,
"Discussion of cutterhead opening design for earth pressure balance machines (EPBMs)", PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING,
Vol. 0,
Num. 0,
Page 1-15,
June 2023,
11
Mostafa Tarafrava, Ebrahim Farrokh,
"Estimation of the stability number and face pressure of the tunnel at the serviceability limit state based on the results of numerical modeling", Journal of Analytical and Numerical Methods in Mining Engineering,
Vol. 13,
Num. 34,
Page 27-39,
April 2023,
12
Ebrahim Farrokh,
"Slump value and consistency index relationship for the application
of EPB TBMs", Arabian Journal of Geosciences,
Vol. 16,
Num. 282,
Page 1-10,
March 2023,
13
Ebrahim Farrokh, Davood Lotfi, Rohullah Khorshid,
"Lace design simulation for the layout optimization of rock cutterheads", Arabian Journal of Geosciences,
Vol. 16,
Num. 123,
Page 1-20,
January 2023,
14
Shahin Fattahi Dehkaboodi, Ebrahim Farrokh, Vahhab Sarfarazi,
"Investigating the effect of changing the depth of penetration, contact area and speed of the cutting disc on the forces acting on the cutting disc with a V-shaped edge", Journal of Rock Mechanics,
Vol. 6,
Num. 3,
Page 13-21,
December 2022,
15
Ebrahim Farrokh,
"Design of cutterhead layout pattern for rock head micro-TBMs", Arabian Journal of Geosciences,
Vol. 15,
Num. 1425,
Page 1-14,
August 2022,
16
Ebrahim Farrokh,
"Using field data and operational constraints to maximize hard rock TBM penetration and advance rates", TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY,
Vol. 125,
Num. 104506,
Page 1-18,
April 2022,
17
Milad Ameri, Ebrahim Farrokh, Hamed Moladavoodi,
"TBM penetration rate prediction using neural networks and neuro-fuzzy
systems", Tunneling & Underground Space Engineering,
Vol. 10,
Num. 1,
Page 35-56,
January 2022,
18
Ebrahim Farrokh,
"Layout design specifications of hard-rock TBM cutterheads at maximum cutter penetration and TBM advance", Arabian Journal of Geosciences,
Vol. 14,
Num. 2049,
Page 1-18,
September 2021,
19
Ebrahim Farrokh, Alireza Amiri, Asadollah Hasoomi,
"Volume loss and face pressure evaluation in Tehran metro line 6, south extension", TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY,
Vol. 116,
Num. 104113,
Page 1-16,
July 2021,
20
Ebrahim Farrokh,
"Cutter change time and cutter consumption for rock TBMs", TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY,
Vol. 114,
Num. 104000,
Page 1-15,
May 2021,
21
Ebrahim Farrokh,
"Primary and secondary tools’ life evaluation for soft ground TBMs", BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT,
Vol. -,
Num. 0,
Page 1-19,
April 2021,
22
Ebrahim Farrokh,
"Construction time optimization for large underground excavations", ,
Vol. 15,
Num. 49,
Page 49-66,
March 2021,
23
Ebrahim Farrokh,
"Uniformly distributed lace design for hard rock TBMs", TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY,
Vol. 110,
Num. 103829,
Page 1-13,
January 2021,
24
Ebrahim Farrokh,
"Lace Design Optimization for Hard Rock TBMs", Amirkabir Journal of Civil Engineering,
Vol. 0,
Num. 0,
Page 1-22,
December 2020,
25
Ebrahim Farrokh,
"Optimum design of the peripheral cutters’ specification on the head profile
for hard-rock TBMs", TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY,
Vol. 107,
Num. 1,
Page 1-11,
October 2020,
26
Ebrahim Farrokh,
"Positioning the Peripheral Cutters in Hard Rock TBMs", Tunneling & Underground Space Engineering,
Vol. 9,
Num. 3,
Page 207-228,
September 2020,
27
Ebrahim Farrokh,
"Force-Penetration Interaction Diagram for Hard Rock TBMs Performance Optimization", Amirkabir Journal of Civil Engineering,
Vol. 0,
Num. 0,
Page 0-0,
September 2020,
28
Ebrahim Farrokh,
"A Study of Cutter Life and Its Influential Factors in Ghomrud Water Conveyance Tunnel", Tunneling & Underground Space Engineering,
Vol. 9,
Num. 2,
Page 163-181,
August 2020,
29
Ebrahim Farrokh,
"Face Pressure Evaluation in Serviceability Limit State", Amirkabir Journal of Civil Engineering,
Vol. 0,
Num. 0,
Page 0-0,
June 2020,
30
Ebrahim Farrokh,
"TBM Tunneling Construction Time with Respect to Learning Phase Period
and Normal Phase Period", Journal of Mining and Environment,
Vol. 0,
Num. 0,
Page 0-0,
March 2020,
31
Ebrahim Farrokh,
"A study of various models used in the estimation of advance rates for hard rock TBMs", TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY,
Vol. 97,
Num. 103219,
Page 1-14,
March 2020,